Haku
Viitteet 1-1 / 1
Automation of Pre Asembly Cell and Improvement of Material Flow : Nokia Networks, Oulu
(Oulun ammattikorkeakoulu, 2015)
The thesis aims to automate several hand assembly phases where the main used tool is a soldering iron. Automation in Nokia Oulu, where is Lean manufacturing system was very succesful and gave a lot of cost savings to ...